Applied Behavioral Services recreational facility in Madisonville, OH was in need of a renovation and HVAC system install to better serve their client base.
Category: HVAC
Columbia Center RTU replacement
During a seasonal HVAC Preventative Maintenance visit, the BMP team found the existing unit had a cracked heat exchanger. This crack posed an air quality risk to the tenants of the space, so it was shut off. The existing unit was past ASHRAE’s 15 year median life expectancy, used a refrigerant type no longer in […]